Prefeasibility study

The purpose of a prefeasibility study is to analyze the relevance of green investments, and to compare various techniques on different points of view.

In practice, we first determine the energy needs of a building and then consider various ways to fill them (heat pumps, cogeneration, thermal or photovoltaic solar panels and wind turbines).

Some simulations, a financial study and a risk study are carried out and the best alternative is proposed.

Our clients are then able to compare different techniques regarding such variables as the payback time and the complexity.